Here are a few pics of the structure this week. They are installing the roof this week, and we'll get our windows next week.
Tuesday, March 24, 2009
Monday, March 16, 2009
A break in the rain
We've had quite a few rainy days in a row now so I haven't been able to get a good picture, but I happened to stop by at lunch today and there was a fortuitous break in the rain so I got a couple of shots of the framing. It is really starting to take shape!
Window on the upper-left will be in our master bath.
Window on the upper-left will be in our master bath.Monday, March 9, 2009
Plumbing and Second Floor

Here is a picture of the addition from the street. It's hard to get a good shot from the back at the moment as the entire addition is pretty well tarped off (roof won't be on for another couple of weeks).

Over the last week they installed the plumbing in our upstairs bathroom (will become the guest bathroom) for the toilet. This week they'll hook up the toilet and re-drywall so that we can move back in and use this bathroom the rest of the way.

While they were plumbing they roughed in the new downstairs powder room as well. Toilet on left, sink of right.
The also framed the upstairs of the addition, but its hard to tell what this is because of the tarp. You'll have to wait a few weeks for a better shot, but it's pretty wild.